Lizzo’s Modern Beverly Hills Mansion
- Supplyarea: Kitchen,Living Room,WineCabinet,TV Cabinet, Bedroom,Closet,Wardrobe,Bathroom Vanity
- Style: Modern
Since 1995. Flexible materials, finishes and OEM manufacturing for kitchens, wardrobes and bathroom vanities. Serving buyers in the US, Europe and beyond.
a World Cup-winning coach
a World Cup-winning coach
a World Cup-winning coach
Modern design, efficient storage
Elegant, personalized, functional
Warm, bespoke comfort
Sleek, luxurious style
Flexible choice of materials, accessories and technologies means "tailor-made for you
A professional team supports in-depth drawings and on-site measurements, and supports personalized services.
It uses imported European pine board and PUR edge banding technology, with excellent environmental performance.
80,000 square meters of factory buildings and 10+ production lines ensure both quality and efficiency.
Founded in 1995, Kejia is a custom furniture and OEM manufacturer based in Foshan, Guangdong, China. We make kitchen cabinets, wardrobes, interior doors and bathroom vanities, with material and finish choices for residential interiors and cost-conscious project specifications. Our sales markets include the United States, the European Union and Australia.
Professional team deepens drawings, makes precise measurements, and creates unique home styles
At Foshan Kejia, we craft bespoke furniture solutions that combine modern design, superior craftsmanship, and eco-friendly materials to enhance your living spaces.
Our kitchen cabinet designs integrate innovative storage solutions with stylish aesthetics, tailored to your unique needs.
Our custom wardrobes maximize space and style, offering personalized designs with premium materials and finishes.
Our bedroom furniture solutions combine comfort and elegance, creating serene and stylish spaces tailored to your lifestyle.
Our living room furniture blends modern design with functionality, creating inviting spaces for relaxation and entertainment.
At Foshan Kejia, we deliver personalized furniture solutions with exceptional design and craftsmanship, integrating innovative technology and premium materials to enhance your quality of life.
We offer flexible customization, selecting materials, styles, and techniques to create a unique home experience tailored to your needs.
Our skilled team ensures every piece of furniture meets exceptional standards through meticulous craftsmanship and rigorous quality control.
We utilize advanced production equipment and technologies, such as 3D visualization, to ensure efficient delivery and precise results.
With a customer-centric approach, we provide end-to-end support from design to installation, ensuring your satisfaction and trust.
Our factory boasts over 80,000 sqm of production space, equipped with advanced machinery for custom furniture manufacturing.
“Kejia’s custom cabinets perfectly met our needs, with outstanding quality and a seamless installation process.”
“Their design team was highly professional, turning our ideas into reality with beautiful and functional results.”
“We are thrilled with Kejia’s whole-home customization; the products are durable, stylish, and exceeded expectations!”
“Kejia’s wardrobe design maximized our space, and their service was attentive and reliable!”
“Their design team was highly professional, turning our ideas into reality with beautiful and functional results.”
“Kejia’s wardrobe design maximized our space, and their service was attentive and reliable!”
kejia
Industry News November 30, 2026